Need a made-to-measure walkable cover for your pool? The Pro Floor adapts to any shape and size — creativity has no limits.
The Pro Floor works as an extension of your floor, supporting up to 200 kg/m². Make real use of the space: add garden furniture, host events, and more.
This type of walkable floor lets you choose any water-compatible finish, from porcelain tile to wood-look. Which one is yours?
more
information
More
information
More
information
More
information
Our most advanced performance. All the essence of our technology and the PoolConcept concept, in one product. The perfect option for businesses and individuals seeking the most advanced solution for their home.
Turn your pool into a multi-use space and adjust the floor to the occasion, need or mood. Play sport, sunbathe, host a lunch, play, dance — and above all, surprise. Versatile, customizable, unique, exclusive, creative, luxurious, functional and surprising — but above all, unmistakably superior.
Talk to
Our Team
Permitted Models
on the PRO deck
The PRO background can be adapted to any type of configuration.
Limitless customization .
Model that descends completely horizontally to the bottom of the pool and can adjust the depth at any time. It includes a metal ladder for entry and exit to the pool.
Model that descends in blocks and adapts to the inclination of the bottom of the pool. . It includes a metal ladder for entry and exit to the pool.
Model that, as the platform descends, steps are formed to access the pool.
Model that, as the platform descends, steps are formed to access the pool. The rigid, unstaggered part descends to the bottom of the pool, adapting to the slope of the pool.
Frequently Asked Questions About the PRO Pool Cover
The cost of a made-to-measure, fully customized Pro Floor starts from €28,900. Price increases based on the size and model chosen by the client.
The platform is independent of the pool, so it can be installed after the pool is already built. The only requirement is that the area must be clear — i.e. if the pool has built-in steps, these must be removed and replaced by the Pro Floor’s own stepped access.
The movable floor is installed at the client’s home in an average of 3 days, with no need for major construction work.
More Information